日韩欧美99I亚洲第一天堂I91久久一区I一级作爱视频I亚洲三级黄色片I国产免费福利视频I国产精品久久久久久妇女6080I一区两区小视频I福利在线免费视频I在线视频麻豆Iav男人在线I91av视频播放I伊人春色网I暖暖日本在线视频Iav一区二区三I欧美亚洲一区I久久成人精品I久久成人av电影I成人天堂噜噜噜I91在线公开视频I国产人妖一区二区三区I久久精品免费在线I久久精品午夜一区二区福利I黄色蜜桃网站I天堂va在线观看I精品欧美一区二区三区免费观看I国产午夜精品无码一区二区

歡迎光臨,深圳市東勝達(dá)偉業(yè)科技有限公司官網(wǎng)!
Industry dynamics
當(dāng)前位置:首頁 ? News ? Industry dynamics

How to lay the floor heating waterproof line?

時(shí)間:2021-12-06| 作者:Admin

Geothermal heating is one of the commonly used heating measures in northern households, which is very helpful for winter. It can be configured not only in living rooms and bedrooms, but also in kitchens and bathrooms. But waterproof and moisture-proof measures should be taken, otherwise it will have a significant impact on the service life of geothermal energy. So how to lay the floor heating waterproof line?

地暖防水線

1. Firstly, it is necessary to handle the floor heating laid on the ground, keep the ground clean, dry, and level, and then apply waterproof paint to prevent geothermal pipes from seeping into the downstairs. After the paint is dry, an insulation layer can be laid to prevent the waterproof film from generating odor when heated. Then lay geothermal pipes, lay a layer of composite film on the surface to isolate moisture, and finally lay the floor.
2. Precautions for floor heating construction.
① Pay attention to floor heating materials
Floor heating is a concealed project. Improper selection of underfloor heating materials, if there are quality issues or short service life, will affect the use and cause huge losses. Therefore, geothermal materials should be inspected before construction. The surface of high-quality floor heating pipes is smooth, without bumps, bubbles, or obvious color differences, and the hardness is moderate.
② Pay attention to on-site measurement
Before the construction of underfloor heating, it is necessary to find a professional installation company to analyze on-site measurements, as not every student's home or any functional area is suitable for installing underfloor heating. If installed in an inappropriate location, it is easy to encounter problems. Usually, a more reasonable design solution is needed.
③ Pay attention to the coil
Strict care must be taken during construction. The coil should pay attention to the distribution spacing, and the corners should not be bent to ensure the uniformity and stability of heat dissipation. During the construction process, the airtightness of the system should be checked at any time, and the water injection pressure test should not be ignored.

在線客服

微信公眾號
服務(wù)熱線:138-2529-3326